Projects

DMC Townsville has completed thousands of successful projects since 1987. To give an idea of the scope of this work, we have listes below a sample of our project history.

For more project history or information about DMC Townsville contact us today.


Airconditioning/ Mechanical Services

  • Youth Hub Facility for Headspace Riverway Townsville using Daikin VRV 3 pipe and 2 pipe systems equipment, toilet ventilation. Stage 1 and Stage 2
  • RAAF Base Training Support Building,
  • Airconditioning to married quarters Supply and Fit RAC and split systems to bedrooms in 1600 hones/units. Including upgrade of Switchboards as required. Total contract $3 million delivered on time for Defence Housing Authority – Townsville
  • Lavarack Barracks Dental Facility Mechanical services for Laboratory and dark room. Maintain for 12 months for Phoenix Construction
  • Cleveland Detention Centre North Ward Townsville QLD Demolition of existing grilles, duct, equipment and wiring. Provide new equipment in the refurbished and new buildings. Supply & install Package units, VRV cassettes, ducted units, and wall split systems complete with associated duct, pipes, electrical, building management including load shedding. Commission and maintain for 12 months.
  • Ninox Night Training Lavarack Barracks Townsville QLD- Supply & install ducted Package units and wall split systems complete with associated duct, pipes, electrical. Commission and maintain for 12 months.
  • Living-In Accommodation Upgrade 1 & 2 – RAAF BASE – Townsville QLD- Install principal supplied inverter split systems and provide mechanical ventilation to individual units. Commission and maintain for 12 months.
  • Dalrymple showrooms Townsville QLD 6 off (Makro, A-Mart, Beacon Lighting, Dare, Silk Road, Mechanical Services & Dare & Silk Road Electrical Services) Supply & install ducted package units ceiling cassettes, wall splits, multi splits, mechanical ventilation. supply & install new ductwork, grilles and fittings. Provide BMS control on the air conditioning services. Commission and maintain for 12 months.
  • Anaconda Spotlight Warehouse Demolition of some existing grilles, duct, equipment and wiring. Provide new and reuse existing equipment in the refurbishment of Mechanical services. Supply & install Cassettes, exhaust fans and install package units, supply & install new ductwork, grilles and fittings, and provide BMS control on the air conditioning & ventilation services. For ACS.
  • Training & Support building Townsville RAAf BASE QLD- Supply and install Trane Air Cooled Rotary Helical Liquid Chiller, AirDesign air handling units, Ajax Chilled water pump, Exhaust systems, Dehumidifyer, air compressor, and modify chilled water pipes to add on to existing system, supply & install new ductwork, grilles and fittings. Provide DDC control on the air conditioning services. Commission and maintain for 12 months.
  • Iris clay Aboriginal Hostel Supply and install AHU’s, Cassettes, and wall splits.  Supply & install new ductwork, grilles and fittings. Exhaust canopies and Kitchen exhausts. Provide BMS control on the air conditioning services. Commission and maintain for 12 months.
  • Civic centre Moranbah QLD- Demolition of some existing grilles, duct, equipment and wiring. Provide new and reuse existing equipment in the refurbishment of Mechanical services. Supply & install, exhaust fans, package units, supply & install new ductwork, grilles and fittings, and provide BMS control on the air conditioning & ventilation services. Maintain for 12 months for Airconditioning Engineers.
  • Blue Care Rowes Bay Townsville QLD 30 Bed Hostel- Supply and install VRV system including, AHU’s, Cassettes, and wall splits.  Supply & install new ductwork, grilles and fittings. Provide BMS control on the air conditioning services. Modify existing kitchen. Commission and maintain for 12 months.
  • Cathedral School Townsville QLD- Supply and install VRV system including, AHU’s, Cassettes, and wall splits.  Supply & install new ductwork, grilles and fittings. Provide BMS control on the air conditioning services. Modify existing kitchen. Commission and maintain for 12 months. For Gabrielli Constructions.
  • Blue Haven – Ingham QLD New 10 Bed Hostel and refurbish existing hostel- Demolition of some existing grilles, duct, equipment and wiring. Supply and install VRV system including, AHU’s, Cassettes, and wall splits, Package units and ducted systems.  Supply & install new ductwork, grilles and fittings. Provide BMS control on the air conditioning services. Modify existing kitchen. Supply & install New cool rooms & cold rooms. Commission and maintain for 12 months.
  • Civic centre & Council building Moranbah QLD. Second Stage Add grilles into existing system, duct, equipment and wiring. Provide new and reuse existing equipment in the refurbishment of Mechanical services. Supply & install, exhaust fans, Commission and maintain for 12 months. For Airconditioning Engineers.
  • Fire Station – Townsville QLD Airport. Supply and install Cassettes and wall splits. Supply & install new ductwork, grilles and fittings for exhaust systems. Commission and maintain for 12 months. For Tactical DCM
  • Loreto Nursing Home Townsville QLD- Supply and install VRV system including, AHU’s, Cassettes, wall splits, ducted systems, ventilation and exhaust systems.  Supply & install new ductwork, grilles and fittings. Provide BMS control on the air conditioning services. Supply & install New cool room. Commission and maintain for 12 months.
  • El-Arish Substation Via Tully QLD- Supply and install DX systemSupply & install new ventilation ductwork, grilles and fittings. Commission and maintain for 12 months.
  • Belgian Gardens Substation Townsville QLD- Supply and install DX system Supply & install new ventilation ductwork, grilles and fittings. Commission and maintain for 12 months.
  • Brothers Leagues Club Townsville QLD- Supply and install package units, ducted air conditioning Supply & install new ventilation ductwork, grilles and fittings. Commission and maintain for 12 months.
  • JCU – 70 Bed Accommodation Townsville QLD- Supply and install VRV system including, AHU’s, Cassettes, and wall splits and ducted systems.  Supply & install new ductwork, grilles and fittings. Provide BMS control on the air conditioning services, outside air ventilation, toilet exhaust system. Commission and maintain for 12 months.
  • Townsville Community Health Centre for Queensland Health- Demolition of some existing grilles, duct, equipment and wiring. Provide new and reuse existing equipment in the refurbishment of Mechanical services. Supply & install chilled Water Chiller, AHU’s Cassettes, medical gases, compressed air and modify chilled water pipes, supply & install new ductwork, grilles and fittings. Modify switchboard and provide BMS control on the air conditioning services. Commission and maintain for 12 months. For Watpac Australia.
  • OZ Care Men’s Hostel Townsville QLD- Airconditioning, ventilation, Dual Temp Cold Room, kitchen exhaust canopy installation. Commission and maintain for 12 months.
  • Thuringowa Medical centre Townsville QLD- mechanical services supply & installation of ducted systems. Commission and maintain for 12 months.

Electrical Services

  • Baulderstone Hornibrook Design & Construct Includes Air Conditioning , ventilation and form 3 switchboards
  • Collinsville Power Station Turnkey Refurbishment Electrical Refurbishment –  Supply and fit to a schedule of rates – 33 personnel were employed on this project for 10 months. DMC completed over $3 million dollars worth of refurbishment client increased project value by almost 3 times and work completed on time for Transfield Power Technologies
  • 700 Housing Commission Homes MT ISA and western towns QLD switchboard upgrade for Q-Build
  • Anaconda Spotlight Warehouse Manufacture & supply switchboards Commission and maintain for 12 months for ACS.
  • Civic centre Moranbah QLD Manufacture, supply & install switchboards for Airconditioning Engineers
  • Ryan Catholic School Townsville QLD- Supply and install  underground mains, lights, communications, TV and manufacture and install switchboards. Maintain for 12 months.
  • Blue Haven – Ingham QLD New 10 Bed Hostel and refurbish existing hostel Supply and install  underground mains, lights, communications, TV and manufacture and install switchboards.
  • Loreto Nursing Home Townsville QLD Supply and install underground mains, lights, power, “C-Bus” system and manufacture and install switchboards, (main switchboard, distribution board and mssb).Commission and maintain for 12 months.
  • El-Arish Substation Via Tully QLD- Supply and install underground mains, lights, power, and manufacture and install switchboards. Commission and maintain for 12 months.
  • Belgian Gardens Substation Townsville QLD- Supply and install underground mains, lights, power, and manufacture and install switchboards. Commission and maintain for 12 months.
  • JCU – 70 Bed Accommodation Townsville QLD- Supply and install reticulated mains, light and power, manufacture and install switchboards, (main switchboard and distribution board). Commission and maintain for 12 months.
  • Loreto Nursing Home – 32 Bed Accommodation Townsville QLD- Supply and install reticulated mains, light and power, manufacture and install switchboards, (main switchboard Bremca and distribution board). Commission and maintain for 12 months.

Sheetmetal Services

  • Entertainment Centre, Townsville Manufacture duct work & plant room for entire project for Parkinson Air Conditioning.
  • Stocklands shopping centre refurbishment, Townsville Manufacture all duct work, plinth surrounds, brackets, for major Air conditioning upgrade.
  • Verdie Building Townsville, manufacture and supply all duct work for Level.
  • Ergon Building Townsville, manufacture and supply all plant room duct work.
  • Townsville Hospital manufacture and supply duct work, pre-insulated aluminium cushion head boxes.

Evaporative Cooling Services

  • Birdsville School QLD Supply & install 1 Industrial Evaporative Air Cooling System for Q-Build Mt Isa
  • Collinsville High School QLD Supply & install 2 Industrial Evaporative Air Cooling  systems.
  • Barkley High School Mt Isa Supply & Install 5 Industrial Evaporative Air Cooling systems
  • Town view High School Mt Isa Supply & install 4 industrial Evaporative Air Cooling systems. Maintain for 12 months.
  • Recreation Hall at Doomadgee near Burketown QLD Supply and install 9 Ducted evaporative air cooling systems. Maintain for 12 months. For Teeni & Arbourne
  • Manual Arts Facility ,Home Hill State high school Ducted Industrial evaporative air coolers, Welding Booth, Spray Booth, Exhaust fans, Compressed Air with all field wiring and all associated work. Maintain for 12 months. For Q-Build
  • Manual Arts Facility Ayr State High School Ducted Industrial evaporative air coolers, Welding Booth, Spray Booth, Exhaust fans, Compressed Air with all field wiring and all associated work. Maintain for 12 months. For CBQ Construction
  • 700 Housing Commission Homes MT ISA and western towns QLD for Q-Build
  • 10 Housing Commission Homes Hughenden QLD- Supply and install 10 Ducted Evaporative Air coolers, associated metal duct, stands, electrical, water. Commission and maintain for 12 months. For NQ Roofing.
  • 10 Housing Commission Homes Hughenden QLD- Supply and install 10 Ducted Evaporative Air coolers, associated metal duct, stands, electrical, water. Commission and maintain for 12 months. For SPD Group
  • 10 Housing Commission Homes Pentland QLD- Supply and install 11 Ducted Evaporative Air coolers, associated metal duct, stands, electrical, water, including timing controls. Commission and maintain for 12 months. For Q-Build